Marine Construction Specialist
Geotechnical Construction
NEWS
Dean Construction Co. Ltd.
Canadian Consulting Engineer. January/February 2010

Burloak Raw Water Intake
By combining marine pipeline with a tunnel, the design-build team for an intake from Lake Ontario to Oakville made construction easier and faster.

By: R.V. Anderson Associates
--------------------------------------------------------------------------------
Originally, plans for a new water intake to feed the Burloak Water Purification Plant in Oakville, west of Toronto, called for a tunnel to be excavated for the entire distance between the intake site and the plant.
Right: Intermediate riser shaft connecting the tunnel with the pipeline.
Read More ...
PVC watermains should spell the end of rust-coloured water in the Windsor, Ontario area municipality of Lakeshore.
Daily Commercial News. September 21, 2009

FOCUS: Sewer and watermain
Lakeshore, Ontario trades in cast iron for PVC watermains

RON STANG
correspondent
LAKESHORE, Ont.
--------------------------------------------------------------------------------
Lakeshore Mayor Tom Bain smiles when he recalls showing taxpayers a cutaway from an old cast iron pipe - part of the town’s aged water system - thick with encrusted rust.
Read More ...
Daily Commercial News. March 27, 2009

Outfall tunnel makes way for more housing in Mississauga and Peel Regions

DAN O’REILLY
correspondent
MISSISSAUGA .
--------------------------------------------------------------------------------
A $23.5-million, 2.2-kilometre-long outfall tunnel is being installed deep below the waters of Lake Ontario at the Clarkson Wastewater Treatment Plant in Mississauga, so that houses and apartments can be built in the city and other parts of Peel Region.
Read More ...
Right, the concrete crew at work on the tunnels.
They will stretch 2.2 kilometres
| HOME | CAPABILITIES  | ABOUT US | ASSOCIATIONS
Marine Construction Specialist - Geotechnical Construction

Dean Construction Company Ltd. is a family owned business that is proud of its long history. Its beginnings can be traced back to 1926 and incorporated in 1947.

2720 Front Road
LaSalle, ON N9J 2N5
Tel: 519-734-8999
Fax: 519-734-6888      
Daily Commercial News. September 21, 2009

FOCUS: Sewer and watermain
Lakeshore, Ontario trades in cast iron for PVC watermains

RON STANG
correspondent
LAKESHORE, Ont.
--------------------------------------------------------------------------------
Lakeshore Mayor Tom Bain smiles when he recalls showing taxpayers a cutaway from an old cast iron pipe - part of the town’s aged water system - thick with encrusted rust.
WATERFRONT TORONTO
Dean Construction Company is the marine subcontractor building a coffer dam and dockwall for the outfall at the channel.
Read More ...
Daily Commerical News & Construction Record, Dec. 20, 2011

Eastern Construction works on West Don Lands stormwater system for Waterfront Toronto

DAN O’REILLY correspondent
--------------------------------------------------------------------------------

A $30-million project designed to control stormwater without disturbing the impacted soils in a former industrial area of east end Toronto is breaking ground both literally and figuratively.