Hamilton – Pier 8 Rehabilitation
- Completion: 2019
- Owner: City of Hamilton
- Project Value: $14,357,00.00
About this Project
Demolition and disposal of existing concrete wharf. Supply and installation of 516 lineal meter of hot rolled sheet piling AZ38-700N in sheet lengths of 70′ complete with supply and installation of 147 concrete block anchors and 75 linear meters of AZ23-800 anchor wall for future pump station.
All works completed using land access. A cast-in-place concrete cope wall complete with ladders, rubber fenders, foot railing and bollards was installed at the top of the sheet piling. Area behind the wall was excavated, backfilled with imported stone as recycled native fill. Electrical conduits were installed for future lighting of the wharf.