Hamilton – Pier 8 Rehabilitation

  • Completion: 2019
  • Owner: City of Hamilton
  • Project Value: $14,357,00.00

About this Project

Demolition and disposal of existing concrete wharf. Supply and installation of 516 lineal meter of hot rolled sheet piling AZ38-700N in sheet lengths of 70′ complete with supply and installation of 147 concrete block anchors and 75 linear meters of AZ23-800 anchor wall for future pump station.

All works completed using land access. A cast-in-place concrete cope wall complete with ladders, rubber fenders, foot railing and bollards was installed at the top of the sheet piling. Area behind the wall was excavated, backfilled with imported stone as recycled native fill. Electrical conduits were installed for future lighting of the wharf.

Hamilton Pier Rehabilitation Dean Construction Company
Hamilton Pier 8 Construction
Hamilton Pier 8 Machinery

Project Details

  • Project Location: Hamilton, Ontario.
  • Contact Person: Ed English
    Phone: 905-546-2424
    E-mail: ed.english@hamilton.ca
  • Consultant: WSP Canada
    Contact Person: Phil Saudino
    Phone: 289-789-3208
    Fax: 905-475-5994
    E-mail: Phil.Saudino@wsp.com 

Contact Us

    2720 Front Road, Windsor, Ontario N9J 2N5

    519-734-8999

    info@deanconstructioncompany.com