Our Clients
We deliver a world class product and invite prospective clients to call us for more information concerning any project they are planning or to request specific references from any of our existing clients.
Get a Quote For Your Project
Government Agencies
- Canadian Coast Guard
- City of Chatham
- City of Sarnia
- City of Toronto
- City of Windsor
- Environment Canada
- Essex Region Conservation Authority
- Hamilton Harbour Commission
- Lower Thames Valley Conservation Authority
-
Ministry of Natural Resources
-
Oshawa Harbour Commission
-
Pelee Island
-
Public Works Canada
-
St. Clair River Conservation Authority
-
St. Lawrence Seaway
-
Toronto Harbour Commission
-
Town of Amherstburg
-
Town of Belle River
- Town of Cobourg
- Town of Gravenhurst
- Town of Leamington
- Town of Port Elgin
- Township of Colchester
- Township of Lambton
- Township of Maidstone
- Township of Mersea
- Windsor Harbour Commission
Corporate Clients
- ADM Industries
- Allied Chemical
- BASF Wyandotte
- Bell Canada
- Brookfield Power
- Calverts Canada
- Canadian Salt Company
- Casino Windsor
- Chrysler Canada
- CN Railway
- CP Railway
- Detroit Windsor Tunnel Corporation
- DoCo Chemicals
- Dofasco
- Dow Chemical
- Ford Motor Company
- General Motors
- Great Lakes Power
- Green Giant
- Hawker Siddley
- Hiram Walkers
- Imperial Oil
- International Harvester
- Maple Leaf Monarch
- Morton Terminal
- Polysar
- Shell Oil
- St. Lawrence Cement
- Sun Oil
- Sunoco
- Windsor Raceway
- Wyandotte Chemical
Latest Projects
Hamilton – Pier 8 Rehabilitation
Demolition and disposal of existing concrete wharf. Supply and installation of 516 lineal meter of hot rolled sheet piling AZ38-700N in sheet lengths of 70′ complete with supply and installation of 147 concrete block anchors and 75 linear meters of AZ23-800 anchor wall for future pump station.
Mid-Halton Sewage Treatment Plant Diffuser Installation
Supplied and installed eighteen, 21m long, 500mm dia. stainless steel risers into holes drilled through overburden and rock on the bottom of Lake Ontario in 30m of water.
Pier 15 West Wharf Reconstruction
Supply and installation of 192lm of 22m and 24m long JZ-127 steel sheet piling.