Replacement of failed breakwall with stone revetment
- Completion Date: May 2013
- Owner: Morterm Limited
- Project Value: $1,100,000.00
About this Project
Work consisted of the emergency removal and containment of contaminated sediments, removal of failed wood and concrete wall and cope and the placement of an engineered armour stone revetment as well as the installation of timber pile fendering clusters. There was also dredging of the materials displaced during the failure and toe-trench excavation.
Project Details
- Location: Windsor, Ontario
- Contact Person: Terry Berthiaume
Phone: 519-972-8020
Fax: 519-972-8028
E-mail: [email protected] - Consultant: Becker Engineering
Contact Person: Dr. Norm Becker